JoyOne factory · fence takeoff
Picket Fence Calculator: Boards, Gaps and Board-on-Board Layers
Give it the run and the board, and it returns the picket count, the pitch, the width the boards actually cover, and what a different gap would cost you in boards.
54 pickets
49 per layer · 6" pitch
49 pickets
24' 0" at a 6" pitch · 54 with waste
- Pitch
- 6"board + gap
- Boards per layer
- 49covers 293 1/2"
- Layers
- 1single face
- Boards
- 49+ 10% waste
- Buy
- 54rounded up
- Surplus
- 5 1/2"trimmed at the end
What the gap changes
| Gap | Per layer | Both layers | With waste | Selected |
|---|---|---|---|---|
| 1/4" | 51 | — | 57 | |
| 1/2" | 49 | — | 54 | yours |
| 3/4" | 47 | — | 52 | |
| 1" | 45 | — | 50 |
Same 24' 0" run, 5 1/2" boards. A wider gap needs fewer boards and lets more wind and more of the neighbour through.
Counts use the dressed board width, not the nominal size: a 1x6 is 5 1/2 in. The elevation is drawn on the pitch you typed, so a wider gap is visible before you buy.
Worked examples
Every number below comes from the same engine that runs in the browser, at build time, so the examples cannot drift from the calculator above.
| Gap | Pitch | Boards | With 10% waste | Width covered |
|---|---|---|---|---|
| 1/4" | 5 3/4" | 51 | 57 | 293" |
| 1/2" | 6" | 49 | 54 | 293 1/2" |
| 3/4" | 6 1/4" | 47 | 52 | 293" |
| 1" | 6 1/2" | 45 | 50 | 291 1/2" |
A 24 ft run of 1x6 boards. The pitch is the board plus the gap, which is the number to divide the run by.
A picket count is a division problem on a pitch
A picket fence is boards on a pitch: board, gap, board, gap. If the board is w in wide and the gap is g, then n boards and n−1 gaps cover n·w + (n−1)·g inches. Set that at least as wide as the run and solve for n: n ≥ (run + g) / (w + g). For a 24 ft run of 5 1/2 in boards with a 1/2 in gap, that is (288 + 0.5) / 6 = 48.08, so 49 boards, covering 295.5 in against a 288 in run — one gap’s worth of surplus, which is what you trim at the end.
The width that matters is the dressed width, not the nominal one. A 1x6 is 5 1/2 in wide and 3/4 in thick once it is planed; a 1x4 is 3 1/2 in. Using 6 in instead of 5 1/2 in under-orders by roughly one board in twelve, and on a 200 ft fence that is sixteen boards — enough to notice at the register and enough to leave a gap somewhere nobody wanted one.
Height is a separate decision and it changes the count twice: a taller fence has more board per bay, and it usually needs a third rail. A 4 ft picket fence on 8 ft bays is the classic front-yard fence and is also the height most US towns allow in a front yard without a variance; 6 ft is the usual back-yard privacy height, and above 6 ft the wind load on a picket fence starts to matter more than the material cost.
What the gap is actually for
The gap is not decoration. It lets the wind through, which on a solid panel fence is the difference between a fence that stands and a fence that leans after the first winter storm. It lets water off the boards and air behind them, so the back face dries instead of growing mould in the shade. And it gives the boards somewhere to go when they swell: untreated or lightly treated pine can move a sixteenth of an inch across its width between a wet spring and a dry August, and a fence built tight in April will be a fence with popped nails in July.
A half inch is the default because it is small enough that a dog cannot get a head through and large enough to be visible as a line. A quarter inch reads as a solid fence from ten feet away and is a common choice on a painted picket fence where the shadow line is the detail; three quarters of an inch is the start of a spaced or “shadowbox” look, where you can see through to the other side and the fence stops being private.
The comparison table on this page shows the count at each gap over your run, so you can see the trade rather than guess it. Widening from 1/2 in to 3/4 in on a 24 ft run drops the count from 49 to 45 boards: four fewer boards, and a fence you can see through.
Gap sizes and what they read as
- 1/4 in: a tight picket fence; needs straight boards and a dry week to install.
- 1/2 in: the standard; drains, dries, and still reads as solid at ten feet.
- 3/4 in: a visible shadow line, the beginning of a see-through fence.
- 1 in and up: a spaced or ranch fence; plan on a third rail and wind bracing.
Board-on-board: two layers, one pitch, half a board offset
Board-on-board is not a board-and-batten fence, and the two get confused constantly. Board-and-batten puts narrow strips over the joints of a solid panel; board-on-board nails a second full layer of boards on the opposite face, offset by half a pitch, so every gap on one side is backed by the middle of a board on the other. You get privacy from both directions and a fence that moves air through the cavity between the layers.
The count is two layers on the same pitch, which is why the calculator doubles the per-layer number rather than inventing a second formula. The offset has one consequence worth planning for: the first and last board of the second layer are ripped to half width, so the ends of the run need a trim board or a post wide enough to cover the joint. The overlap field is the lap past the gap — set it smaller than the gap and the second layer cannot cover the hole, which is a warning this page raises rather than a number it quietly accepts.
Material goes up by half again, not double, in real builds: the second layer is usually a narrower board, and the frame can be shared. What doubles is the fastening time, and that is the cost that surprises people. Two layers of 5/4 boards on an 8 ft bay is 64 nails a bay before you count the rails.
Buying boards: pitch, waste and the rip at the end
Order from the pitch, then add waste. A picket run always ends with a partial gap or a ripped board, and a 10% allowance covers the boards that arrive with a split end, a bad knot or a bow you cannot pull out with a nail. On 49 boards that is five extra, which is one more bundle in most yards’ packaging.
Board length is the other half of the order and it is easy to get wrong. A 4 ft fence takes 4 ft pickets, but a picket sits on a rail and the rail sits on a post, so the picket length is measured from the top of the bottom rail to the top of the picket, not from grade. A fence that is 4 ft above grade with a bottom rail 8 in up needs a 44 in picket, and buying 48 in ones means either cutting 49 boards or burying the bottom rail.
Pre-primed and pre-stained pickets cost more per board and save a day of labour, which is usually the right trade on a picket fence because there are so many faces to paint. If you are staining after installation, the picket page and the stain page work as a pair: this one gives you the board count and the face area, and the stain page turns that into gallons.
Setting out the first panel so the last one is not a sliver
Mark the posts first, then divide each bay into pickets rather than marking pickets along the whole run. A run marked from one end accumulates error: an eighth of an inch per board over 49 boards is six inches at the far end, and the last gap is either zero or a hand wide. Dividing each bay separately resets the error at every post, which is why the plan on the home page works in bays.
Set the top of the pickets with a line, not with a level held against each board. A chalk line at the finished height, pulled tight and checked at both ends, keeps 49 board tops in one plane; a level per board keeps each board vertical but lets the tops wander. On a picket fence the top line is the whole look.
Finally, check the gate before you fill the last bay. A gate hangs from a post that now has 40 lb of pickets pulling on it, and if the gate post is not braced or set deeper, the gate will drop within a season and the latch will miss. That is a fence problem with a post answer, which is why the post depth page exists next to this one.
Questions people ask before digging
How many pickets do I need for 100 feet of fence?
With 5 1/2 in boards and a 1/2 in gap, the pitch is 6 in, so 100 ft (1200 in) needs (1200 + 0.5) / 6 = 200.08, rounded up to 201 boards; 221 with a 10% allowance. With a 3/4 in gap the pitch is 6 1/4 in and the same run needs 193 boards.
Is a 1x6 really 6 inches wide?
No. A 1x6 is planed to 3/4 in thick and 5 1/2 in wide, which is the surfaced size in PS 20, the American Softwood Lumber Standard. Every count on this page uses 5.5 in. Using the nominal 6 in under-orders by about 8%, which on a 200 ft fence is sixteen boards.
How wide should the gap between pickets be?
Half an inch for a standard privacy picket fence: it drains, dries and still reads as solid. A quarter inch looks tighter and is common on painted fences, three quarters is the start of a see-through fence, and anything over an inch wants a third rail and wind bracing because the boards are catching wind with nowhere to go.
What is the difference between board-on-board and board-and-batten?
Board-on-board is two full layers of boards on opposite faces, offset by half a pitch so each layer covers the other’s gaps. Board-and-batten is one layer of boards with narrow strips nailed over the joints on one face. Board-on-board doubles the board count and gives privacy from both sides; board-and-batten adds about a fifth to the material and gives privacy from one.
How much waste should I add to a picket order?
Ten percent is the usual allowance, and it covers split ends, knots and the rip at the end of a run. Add more if you are matching grain on a stained fence, if the boards are a lower grade, or if the run has a lot of short bays where offcuts cannot be reused.
Every number on this site, with where it came from
| Value | As used here | Basis | Source |
|---|---|---|---|
| Post hole diameter | 3x the post | “The diameter of the posthole should be 3 times the post diameter.” SAKRETE gives the same rule with a worked example: “a 4 in post will require a 12 in hole”. | QUIKRETE, “Setting Posts” project sheet |
| Post hole depth (manufacturer rule) | 1/3 of overall post + 6 in gravel | “Hole depth should be 1/3 the overall post length, plus 6 in (150 mm) for the gravel base.” SAKRETE’s version is one third of the height above ground. This site takes the deeper of the two. | QUIKRETE, “Setting Posts” project sheet |
| Frost line | at least 6 in below it | “When the post is to be used for structural support … the hole must extend at least 6 in (150 mm) below the frost line.” The local frost depth itself is set by the building department, not by this page. | QUIKRETE, “Setting Posts” project sheet |
| Gravel base under a post | 6 in | “place 6 in (150 mm) of … gravel or crushed stone in the hole to aid in drainage.” | QUIKRETE, “Setting Posts” project sheet |
| Bag yield, fast-setting | 0.375 cu ft (50 lb), 0.45 cu ft (60 lb) | Data sheet yield table. SAKRETE’s high-strength mix yields 0.30 / 0.45 / 0.6 cu ft at 40 / 60 / 80 lb, so a “bag” is never a fixed volume. | QUIKRETE Fast-Setting Concrete Mix, data sheet 1004 |
| Bag yield, standard mix | 0.30 / 0.375 / 0.45 / 0.60 / 0.675 cu ft | Yield table for 40, 50, 60, 80 and 90 lb bags. | QUIKRETE Concrete Mix, data sheet 1101 |
| Bag count, worked example | 2 x 50 lb bags | “Two 50 lb bags … will set a 3 in square post in a 9 in diameter hole 30 in deep.” The engine reproduces that count from the hole and post volumes, with the 6 in gravel base included. | QUIKRETE Fast-Setting Concrete Mix, data sheet 1004 |
| Post spacing convention | 6, 8 or 10 ft equal intervals | “Divide this length into equal intervals of 6 ft, 8 ft, or 10 ft … In this way standard precut lumber can be used for the crossrails.” 8 ft is the default here because 8 ft is the rail length sold everywhere. | QUIKRETE, “Fence and Trellis Designs” project sheet |
| Rail count convention | 2 rails to 6 ft, 3 above | Convention, not code. The manufacturer’s fence design uses a top rail plus bottom and middle rails, i.e. three; two rails on a 4–6 ft fence is the common trade practice this site starts from. | QUIKRETE, “Fence and Trellis Designs” project sheet |
| Stain coverage | 250–600 ft²/gal, one coat | Product details state coverage of 250 ft²/gal to 600 ft²/gal with one coat recommended. The default here is the low end, 250 ft²/gal, and every field is editable. | Cabot Australian Timber Oil |
| Dressed lumber sizes | 4x4 = 3.5 in, 6x6 = 5.5 in, 1x6 = 5.5 in | PS 20 surfaced sizes, read from the standard: nominal thickness and width are reduced by planing. The engine keeps them in one table and a test asserts each value. | ALSC, American Softwood Lumber Standard PS 20 |
| Feet to metres | 1 ft = 0.3048 m exactly | The international foot is defined as exactly 0.3048 m; the metric column is a conversion, not a second measurement. | NIST SP 811, Guide for the Use of the SI |
Sources
- QUIKRETE, “Setting Posts” project sheet
Step 1: the hole is three times the post diameter, one third of the overall post length plus 6 in for gravel, and at least 6 in below the frost line for a structural post. - QUIKRETE Fast-Setting Concrete Mix, data sheet 1004
Yield: 50 lb = 0.375 cu ft, 60 lb = 0.45 cu ft. Also: “Two 50 lb bags … will set a 3 in square post in a 9 in diameter hole 30 in deep” — the bag-count check this site’s engine is tested against. - QUIKRETE Concrete Mix, data sheet 1101
Yield: 40 lb = 0.30, 50 lb = 0.375, 60 lb = 0.45, 80 lb = 0.60, 90 lb = 0.675 cu ft. - QUIKRETE, “Fence and Trellis Designs” project sheet
Plotting the fence: divide the overall length into equal intervals of 6, 8 or 10 ft so precut rails work. Rails are usually 2x4 in 6, 8 or 10 ft lengths. Finishing: top rail first, then “position bottom and middle rails”. - SAKRETE, “Setting Posts” project guide
Hole width about 3x the post width (“a 4 in post will require a 12 in hole”); hole depth about one third of the post height above ground (“a 6 ft tall fence requires a 2 ft deep hole”); dig about 6 in below the frost line. - SAKRETE High Strength Concrete Mix
Yield: 0.30 cu ft (40 lb), 0.45 cu ft (60 lb), 0.6 cu ft (80 lb). - Cabot Australian Timber Oil
Product details: coverage 250 ft²/gal – 600 ft²/gal, one coat recommended. - ALSC, American Softwood Lumber Standard PS 20
Reading of PS 20, not a quotation: nominal sizes are planed to standard surfaced sizes, so a 4x4 is 3 1/2 in square, a 6x6 is 5 1/2 in square, a 1x6 is 5 1/2 in wide and 3/4 in thick, and a 2x4 is 3 1/2 in wide. - NIST SP 811, Guide for the Use of the SI
The international foot is exactly 0.3048 m, so 1 ft = 0.3048 m and 1 m = 3.280 839 895 ft.
These are quantity estimates. Post depth and frost depth are set by your local building department, hole and footing sizes by your soil and your inspector, and panel and stain coverage by the product you actually bought. Check the manufacturer’s label and your local code before you dig, and call 811 (in the US) or your local utility locator before the first hole. Nothing you type leaves your browser.