JoyOne factory · fence takeoff

Fence Calculator: Posts, Pickets, Rails and Concrete for the Whole Run

Type the sides the way you measured them and the gate you want. The plan redraws with every post classified, and the takeoff follows: pickets, rails, gravel, bags of concrete and the post length to buy.

Multi-side plan Gate openings Post-by-post type Printable takeoff

34 posts

32 bays · widest 8' 0" o.c.

The run
ft
ft
ft

A loop shares its first and last corner post; an open run ends at a post on each end.

Gate
ft

Clear width between the gate posts. Set it to 0 for no gate.

Panels
ft
in

Half an inch drains and still reads as solid.

%
Posts and concrete

Yield is from the manufacturer’s data sheet.

Every field is a starting point: change it and the takeoff follows. Numbers stay in your browser and a shared link keeps them after the #, which is never sent to a server.

Takeoff

34 posts

246' 0" of fence · 543 pickets · 204 bags of concrete

Total run
250' 0"76.2 m · 76200 mm
Railed length
246' 0"1 gate opening(s) deducted
Bays
32widest 8' 0" o.c.
Posts
342 end · 2 corner · 2 gate
Pickets
543493 before waste
Rail boards
642 rails · 8 ft stock
Concrete
204 bags6 per hole
Post length
10 fthole 3' 6"
3 side(s), 100' 0", 50' 0", 100' 0". 34 posts: 2 end, 2 corner, 2 gate, 28 intermediate. 1 gate opening(s). Drawn to one uniform scale; turn angles are schematic. 4' 0" gate100' 0"12 bays · 8' 0" o.c.50' 0"100' 0"13 bays · 7' 8 5/16" o.c.
  • End post
  • Corner post
  • Gate post
  • Intermediate
  • Gate swing

The takeoff

ItemQuantityHow it was counted
End posts2One at each open end of the run.
Corner posts2Shared by two sides — counted once.
Gate posts2Two per opening; usually a heavier stock.
Intermediate posts28On the 32 bays.
Post stock, 4x410 ft9' 0" needed; cut 1' 0" off.
Rails, 2 per bay64 × 8 ft64 rail runs over 32 bays.
Pickets543493 + 10% waste, 5 1/2" boards at 1/2" gaps.
Gravel34 × 6 inOne 6 in base per hole.
Concrete, 50 lb bags2046 per hole at 1.9 cu ft.

Posts are counted once at a shared corner. Gates are openings: they take two gate posts and remove a bay of fence.

Posts for this fence

ItemValueWhy
Buried depth3' 0"deeper of the two manufacturer rules
Hole depth3' 6"buried + 6 in gravel base
Post to buy10 ftstandard stock: 8, 10, 12 ft
Cut off1' 0"treat the cut end before it goes in the ground

Spacing is divided equally per run, gate openings centred. Post depth follows the rule you choose and is checked against the frost line; the hole includes 6 in of gravel.

Worked examples

Every number below comes from the same engine that runs in the browser, at build time, so the examples cannot drift from the calculator above.

ShapeTotal runPostsEnds + cornersGate postsIntermediateBays
3 sides, one gate (this page)250' 0"34422832
Closed yard, two gates200' 0"27422126
One straight run120' 0"16201415

Every row is computed by the same engine that runs in the browser, at build time. A closed loop has no end posts: its four corners are shared between two sides each.

Measure the line, then let the calculator divide it

A fence takeoff starts with one number per straight run, measured between the points where the fence actually turns. Pull the tape along the ground, not along the string you will later set at the top of the posts, because the string follows the fence and the ground is what the posts have to reach. Write each run down separately — 100 ft, 50 ft, 100 ft is three numbers, and the corners between them are where the post count stops being obvious.

Dig the first and last post of each run before you trust any of it. A property line measured from a plat is a legal line; a fence line measured on the ground is what you are building, and the two differ by whatever the survey pins are buried under, plus the setback your code requires from the line itself. Most US jurisdictions require the fence to sit inside your property, and some require a setback from a sidewalk or a drainage easement, which changes the total length before a single post is placed.

Then choose the gate. A gate is not a panel with hinges on it: it is an opening with a post at each side, and those posts carry the gate’s weight, its racking load and its slam. Putting the opening in the middle of a long run is the easy case; putting it where the driveway is means the run on one side is shorter than the spacing rule wants, and the calculator will tell you when a leftover run gets too short to fill.

Before you type a number

How 34 posts come out of 250 feet of fence

The default run on this page is 250 ft in three sides with one 4 ft gate, and it needs 34 posts. Eight feet is the maximum spacing, so a 48 ft run divides into six bays of exactly 8 ft and gets seven posts; a 50 ft run divides into seven bays of 7 ft 1 11/16 in and gets eight; the 100 ft side without a gate divides into thirteen bays of 7 ft 8 5/16 in and gets fourteen. Nothing is rounded to a whole foot, because rounding is how a fence ends up with one bay 8 ft 6 in and a rail that will not reach.

The count is not the sum of the per-side counts, because corners are shared. Three sides in an open run have four junction posts, not six, and a closed loop of four sides has four junction posts rather than five. That is the difference between ordering 34 posts and ordering 36 and having two left over — or worse, ordering 34 when the layout needs 36 because a gate added a pair.

Gates are counted separately because they are different posts. Each opening takes two gate posts, which are usually a heavier stock, set deeper and braced against the gate’s leverage. The 4 ft gate in the default run sits in the middle of the 100 ft side, so that side becomes two 48 ft runs of six bays each, and the total goes from 32 posts to 34: two extra gate posts and the same number of intermediate posts the two runs would have had anyway.

Pickets and rails follow from the bays, not from the length

Picket count is a division problem on a pitch. A 1x6 board is 5 1/2 in wide once it is planed, and a 1/2 in gap between boards makes a 6 in pitch. Over 246 ft of railed fence that is 492 boards plus the one that closes the last gap, so 493 — and 543 with a 10% allowance for the boards that arrive cupped, split or short. The arithmetic is the same in every panel; what changes is the gap, and the picket page shows what a quarter inch does to the count over a long run.

Rails are counted per bay per rail height. Two rails on 32 bays is 64 rail runs, and with 8 ft precut rails that is 64 boards, because no bay here is longer than 8 ft. Raise the fence above 6 ft and the calculator switches to three rails, which is 96 runs and a third more rail material — a cost that arrives with the height rather than with the length.

This is the point where a fence estimate usually goes wrong. A quote built from linear feet only will under-order posts on a run with many turns and over-order rails on a run with none. Counting bays and posts separately is slower to explain and correct on the receipt.

Concrete: the number that decides whether you go back to the store

Every post gets a hole, every hole gets a bag count, and the count depends on three numbers: how wide the hole is, how deep the concrete sits, and how much of that volume the post itself takes up. A 4x4 is 3 1/2 in square in the ground, not 4 in, and at 36 in of concrete it displaces about 0.26 cu ft — a third of a bag that a naive calculation would order twice.

The default numbers here come from the manufacturers’ own sheets: a hole three times the post width (12 in for a 4x4), a hole depth of 3 ft 6 in for a 6 ft fence, 6 in of gravel at the bottom for drainage, and a 50 lb bag of fast-setting mix that yields 0.375 cu ft. That works out at 1.90 cu ft of concrete per hole, which is six bags, and 204 bags for the 34 posts. Change the post to 6x6 and the same hole leaves more concrete around a bigger post; change the bag to 80 lb and the count falls to four.

Six bags a hole is a real number, not a conservative fudge: with 6 in of gravel and 3 1/2 in of soil left on top, the pour is 32 1/2 in deep and holds 2.13 cu ft before the post displaces anything, and a 50 lb bag is a third of a cubic foot. If that sounds like a lot of concrete, the alternative is a narrower hole — and the narrow hole is the one that cracks when the ground moves, which is why the 3x rule exists.

What the printed takeoff covers, and what it deliberately leaves out

The takeoff lists posts by type (so the gate posts and corner posts can be bought as the heavier stock they usually are), rail boards at the length you picked, pickets before and after waste, gravel, and bags of concrete. It does not list nails, screws, hinges, latches, post caps or the concrete you will spill, because those are bought by the box and every builder has an opinion about which box.

It also does not design the fence. Wind load, frost depth, soil bearing, the required setback, the height limit and whether a corner needs a diagonal brace are all local decisions, and on a tall fence in an exposed site they matter more than any number here. What the page does do is show its working: the plan, the bays, the spacing in feet and inches, and the source sentence behind each rule, so an inspector or a builder can check the assumption instead of the arithmetic.

Nothing you type is uploaded. The form keeps its numbers in your browser, and a shared link carries them in the address fragment after the hash, which is never sent to a server and never reaches the analytics — the same rule the rest of this site is tested against.

Questions people ask before digging

How many posts do I need for 250 feet of fence?

About 34 at 8 ft maximum spacing with one 4 ft gate, and the count depends on the shape. Three sides of 100, 50 and 100 ft have four shared junction posts; the 4 ft gate adds two gate posts; the remaining runs divide into 32 bays and carry 28 intermediate posts. A straight 250 ft run would need 33 posts, so the shape of the line changes the order by one or two.

How far apart should fence posts be?

Eight feet on centre is the default because 8 ft is the length precut rails and most panels are sold in, and QUIKRETE’s fence guide says to divide the run into equal intervals of 6, 8 or 10 ft so standard rail lengths work without cutting. Six feet is stronger and better in wind; 10 ft is cheaper and sags unless the rails are heavier. Whatever you pick, divide each run equally rather than stepping 8 ft at a time and leaving a short bay at the end.

How many pickets do I need?

Divide the railed length by the pitch — the board width plus the gap — and round up. With 5 1/2 in boards and a 1/2 in gap the pitch is 6 in, so 246 ft of fence needs 493 boards, or 543 with a 10% allowance. A 1x6 is 5 1/2 in wide when dressed, not 6 in, and using the nominal number under-orders by about 8%.

How many bags of concrete per fence post?

For a 4x4 post in a 12 in hole with 6 in of gravel and 3 1/2 in left for soil, the pour is 32 1/2 in deep and takes 1.90 cu ft, which is six 50 lb bags of fast-setting mix or four 80 lb bags of standard mix. A 6x6 post in the same hole leaves less to fill because the post displaces more. A narrower 9 in hole with a 3 in post takes two 50 lb bags, which is the example on the manufacturer’s own sheet.

How deep should fence posts be?

At least one third of the height above ground, and ideally half: a 6 ft fence gets 2 to 3 ft of post in the ground, plus 6 in of gravel under it, and deeper where the frost line is lower than that. Both QUIKRETE and SAKRETE put the hole at least 6 in below the frost line, and the post length is rounded up to the next standard stock, so a 6 ft fence usually ends up on a 10 ft post with the top cut off.

Every number on this site, with where it came from

ValueAs used hereBasisSource
Post hole diameter3x the post“The diameter of the posthole should be 3 times the post diameter.” SAKRETE gives the same rule with a worked example: “a 4 in post will require a 12 in hole”.QUIKRETE, “Setting Posts” project sheet
Post hole depth (manufacturer rule)1/3 of overall post + 6 in gravel“Hole depth should be 1/3 the overall post length, plus 6 in (150 mm) for the gravel base.” SAKRETE’s version is one third of the height above ground. This site takes the deeper of the two.QUIKRETE, “Setting Posts” project sheet
Frost lineat least 6 in below it“When the post is to be used for structural support … the hole must extend at least 6 in (150 mm) below the frost line.” The local frost depth itself is set by the building department, not by this page.QUIKRETE, “Setting Posts” project sheet
Gravel base under a post6 in“place 6 in (150 mm) of … gravel or crushed stone in the hole to aid in drainage.”QUIKRETE, “Setting Posts” project sheet
Bag yield, fast-setting0.375 cu ft (50 lb), 0.45 cu ft (60 lb)Data sheet yield table. SAKRETE’s high-strength mix yields 0.30 / 0.45 / 0.6 cu ft at 40 / 60 / 80 lb, so a “bag” is never a fixed volume.QUIKRETE Fast-Setting Concrete Mix, data sheet 1004
Bag yield, standard mix0.30 / 0.375 / 0.45 / 0.60 / 0.675 cu ftYield table for 40, 50, 60, 80 and 90 lb bags.QUIKRETE Concrete Mix, data sheet 1101
Bag count, worked example2 x 50 lb bags“Two 50 lb bags … will set a 3 in square post in a 9 in diameter hole 30 in deep.” The engine reproduces that count from the hole and post volumes, with the 6 in gravel base included.QUIKRETE Fast-Setting Concrete Mix, data sheet 1004
Post spacing convention6, 8 or 10 ft equal intervals“Divide this length into equal intervals of 6 ft, 8 ft, or 10 ft … In this way standard precut lumber can be used for the crossrails.” 8 ft is the default here because 8 ft is the rail length sold everywhere.QUIKRETE, “Fence and Trellis Designs” project sheet
Rail count convention2 rails to 6 ft, 3 aboveConvention, not code. The manufacturer’s fence design uses a top rail plus bottom and middle rails, i.e. three; two rails on a 4–6 ft fence is the common trade practice this site starts from.QUIKRETE, “Fence and Trellis Designs” project sheet
Stain coverage250–600 ft²/gal, one coatProduct details state coverage of 250 ft²/gal to 600 ft²/gal with one coat recommended. The default here is the low end, 250 ft²/gal, and every field is editable.Cabot Australian Timber Oil
Dressed lumber sizes4x4 = 3.5 in, 6x6 = 5.5 in, 1x6 = 5.5 inPS 20 surfaced sizes, read from the standard: nominal thickness and width are reduced by planing. The engine keeps them in one table and a test asserts each value.ALSC, American Softwood Lumber Standard PS 20
Feet to metres1 ft = 0.3048 m exactlyThe international foot is defined as exactly 0.3048 m; the metric column is a conversion, not a second measurement.NIST SP 811, Guide for the Use of the SI

Sources

These are quantity estimates. Post depth and frost depth are set by your local building department, hole and footing sizes by your soil and your inspector, and panel and stain coverage by the product you actually bought. Check the manufacturer’s label and your local code before you dig, and call 811 (in the US) or your local utility locator before the first hole. Nothing you type leaves your browser.